Share the plans
Send your drawings, scope, project location, and deadline. We confirm the fee and delivery schedule.
- PDF drawings and specifications
- Trades, location, and bidding role
- Bid deadline and current addenda

YOUR CONSTRUCTION ESTIMATING PARTNER
Detailed estimates. Measured takeoffs. Clear proposals.
The estimating support your next project deserves.
From takeoff to final bid
The detail behind a better bid.Quantities · Costs · Scope clarityPlan-based quantities
Trade-by-trade pricing
Clear inclusions & exclusions
01 / WHAT WE DO
Take on the next opportunity with the support to price it properly. We handle the details so you can focus on the work ahead.
02 / THE R&K STANDARD
A proposal should be easy to follow and easy to review. Explore a trade to see the scope behind the number.
| Trade / scope | Quantity | Amount |
|---|---|---|
| 1,850 SF | $24,500 | |
| 18,600 SF | $84,600 | |
| 7,800 SF | $34,300 | |
| 1,400 SF | $12,650 | |
| 7,900 SF | $67,450 |
Luxury vinyl tile with adhesive, layout, transitions, and defined floor preparation. Quantities follow the finish schedule.
Rubber base is priced as its own trade item.
$4.75 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Select a trade to explore · Share of subtotal
Illustrative quantities and pricing from our sample format. This is not a live bid or a project quote.
Selective removal of existing finishes and partitions within the indicated work area. Coordinate removals with the demolition plans.
Dumpsters are carried separately.
Not applicable
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Three 30 CY dumpster pulls, including delivery, disposal, and collection.
Additional pulls require a scope adjustment.
Not applicable
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Building footings, slabs, and pads, including reinforcement, forms, placement, curing, and control joints.
Exterior flatwork is carried in site concrete.
Not applicable
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Exterior walkways, accessible ramps, and entrance flatwork with subgrade preparation and broom finish.
Curb and gutter are excluded unless identified.
Not applicable
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Gypsum board for wall assemblies, measured by layer. Includes joint treatment, corner protection, and Level 4 finish.
Wet-area and rated assemblies follow the wall types.
$0.62 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Gypsum board at hard ceilings and soffits with finish levels appropriate to exposed and concealed locations.
Refer to the reflected ceiling plan for extents.
$0.62 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Suspended 2 × 2 acoustical ceiling system, including grid, supports, perimeter trim, and tile.
Include seismic bracing where required.
$5.50 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Luxury vinyl tile with adhesive, layout, transitions, and defined floor preparation. Quantities follow the finish schedule.
Rubber base is priced as its own trade item.
$4.75 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Porcelain floor tile with setting materials, grout, movement joints, and finish transitions.
Restroom wall tile is listed separately.
$6.25 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Four-inch rubber cove base, including adhesive, corners, and terminations.
Measured along the applicable finished wall perimeter.
$1.65 / LF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Tile wall finishes with wet-area backing, mortar, grout, trim, and corner detailing.
Coverage follows the interior elevations.
$8.50 / SF
Material allowance within the sample trade total. Final specifications are confirmed for each project.
Seven exterior hollow metal doors and twelve interior wood doors with frames and standard commercial hardware.
Storefront assemblies are excluded.
HM $1,500 / EA · Wood $450 / EA · Hardware $275 / EA
Material allowance within the sample trade total. Final specifications are confirmed for each project.
03 / HOW WE WORK
One point of contact.
A clear process at every step.
Send your drawings, scope, project location, and deadline. We confirm the fee and delivery schedule.
We measure, price, and organize the scope, then review the quantities and totals before delivery.
Receive your takeoff and proposal, with support for the revisions and addenda your project needs.
THE PROJECTS YOU BID
04 / BEFORE WE BEGIN
YOUR NEXT PROJECT STARTS HERE
Tell us what you’re bidding and when it’s due.
Let’s put a clear scope behind your next number.