FIELD GUIDE · BEFORE YOU SEND THE PLANS

What to send your estimator.

Every gap in the package becomes an assumption in the estimate, and assumptions are where margin disappears. Here is what a complete estimating request looks like, and why each piece matters.

5 min readR&K Construction Solutions

Why the package matters more than the deadline

An estimator can only price what is on the page. When a sheet is missing, the quantity behind it is either left out or guessed. Left out, it shows up later as a change order you cannot recover. Guessed, it shows up as a number nobody can defend when the owner asks where it came from.

A complete package does two things. It makes the estimate faster, because nobody waits on a missing schedule halfway through the takeoff. And it makes the estimate defensible, because every quantity traces back to a sheet you sent.

The checklist

1. The full drawing set, by discipline

Send every discipline that was issued, even the ones you think do not touch your scope. Architectural plans carry the partitions and finishes, but structural sheets show slab edges and thickened slabs, and civil sheets show where the site concrete stops. Interior trades are often priced off the architectural set alone, and that is how soffits, rated shafts and furred columns get missed.

  • Architectural: plans, elevations, sections, details, reflected ceiling plans
  • Finish plans and the room finish schedule
  • Wall types and partition schedule, including fire ratings
  • Door, frame and hardware schedules
  • Structural, civil and MEP sheets, even if they are by others

2. The finish schedule, not just the floor plan

Finish materials come from the finish schedule. The floor-assembly or legend sheet tells you what a floor is built from; the schedule tells you what goes on top of it, room by room. When the two disagree, the schedule wins, and the estimate should say so in a clarification.

3. Specifications or the project manual

Specs decide the grade of everything the drawings only outline: drywall finish level, tile setting materials, moisture testing before flooring, attic stock, warranty terms. A drawing set without specs produces a number that is right about quantity and wrong about cost.

4. Every addendum issued to date

Send them all, numbered, even the ones that only change the bid date. An addendum that revises a door schedule or adds a rated wall changes quantities that were already measured. Tell your estimator which addendum is the latest so nothing is priced from a superseded sheet.

5. Bid form and instructions to bidders

The bid form tells the estimator how the number has to be broken out: base bid, alternates, unit prices, allowances the owner wants carried. Pricing the right scope in the wrong format still costs you the bid.

6. Your role and your scope split

Say whether you are bidding as the general contractor or as a trade. Then list what you are carrying and what is by others. A subcontractor estimate stays inside the assigned scope. A GC estimate adds general conditions, overhead and markup. The same plans produce two very different numbers.

7. The due date and time

Include the time zone. A bid due at 2:00 PM is a different deadline for an estimator working across time zones, and it decides how much review the estimate gets before it goes out.

8. For renovations: photos and existing conditions

Demolition is priced from what is there today, which the new drawings rarely show. A few photos of the existing floors, ceilings and walls answer questions that would otherwise become allowances.

How to share a large plan set

One shared folder link is better than twelve email attachments. Before you send it, check that the link allows anyone with it to view and download, and keep the folder organized the way the set was issued: drawings, specs, addenda. If a file is too large to email, the link is the right answer.

What happens next

A good estimating partner reviews the package before starting and tells you two things: the fee and the delivery date. If something cannot be measured from what you sent, it should be flagged on its own line and everything else priced, so a missing detail never holds up the whole estimate.

THE SHORT VERSION

  • Full drawing set, every discipline
  • Finish schedule and room finish plan
  • Specifications or project manual
  • All addenda, with the latest one named
  • Bid form and instructions to bidders
  • Your role (GC or trade) and the scope split
  • Due date, time and time zone
  • Photos of existing conditions for renovations

QUICK ANSWERS

Questions we hear often.

What is the minimum I need to send for an estimate?

The drawing set, the finish schedule and the bid due date. Specifications and addenda make the number more reliable, and anything missing is flagged in the estimate instead of guessed.

Can I send plans as a shared link?

Yes. A single folder link with view and download access is the easiest way to share a large set. Email works for smaller sets.

YOUR NEXT PROJECT STARTS HERE

Bring the plans.
We’ll bring the detail.

Tell us what you’re bidding and when it’s due.
Let’s put a clear scope behind your next number.

Request an estimatePrefer to talk? +1 (602) 516-3601